top of page
  • Facebook
  • Twitter
  • Instagram

Thank you PLA attendees

 

Planning a Library Renovation?

Flooring Replacement Without Removing Books

For more than 30 years, NLI Inc. (Library Lifters) has assisted libraries with renovation projects by safely moving fully loaded shelving units. This allows flooring replacement, layout changes, and accessibility improvements to be completed without removing books from the shelves.

Our process helps libraries complete projects more efficiently while keeping collections organized and minimizing disruption to daily operations.

Why Libraries Use Lift-and-Shift

Traditional renovation methods often require books to be packed and shelving to be dismantled before flooring work can begin. This can add significant labor, time, and disruption.

Our lift-and-shift approach allows shelving to be carefully lifted and relocated while the books remain in place.

Benefits may include:

• Books remain in order
• Reduced packing and handling
• Shorter project timelines
• Work completed in phases while the library remains open
• Less disruption for staff and patrons

Services

Stack Moving

Relocation of fully loaded shelving units for renovations, reconfigurations, or flooring replacement.

Carpet Replacement Under Shelving

Installation of carpet tile in areas beneath shelving using lift-and-shift methods.

Layout Reconfiguration

Adjusting shelving locations to improve circulation paths, widen aisles, or support updated space plans.

Project Planning Support

Assistance with measurements, material quantities, and phased renovation planning.

Stack Moving Only

For projects where flooring installation is being handled by another contractor, we can provide stack moving services as part of the project team.

Planning a Project in the Next 1–5 Years?

Many libraries begin evaluating renovation needs well before work begins. We can assist with early planning discussions related to:

• Aging or worn flooring
• ADA accessibility improvements
• Layout updates
• Expansion or downsizing
• Phased renovation approaches
• Budget planning for future capital projects

Experience

Our crews travel throughout the continental United States, working with public, academic, government, and special libraries of many sizes.

The team members who attend conferences and consultations are the same experienced professionals who perform the work on site.

Project Review

Libraries are welcome to share floor plans or project information for an initial review. We can help identify possible approaches, rough material quantities, and scheduling considerations.

Frequently Asked Questions

Can shelving be moved while fully loaded?
Yes. Specialized lifting equipment allows shelving to be raised and relocated safely while books remain in place.

Does the library need to close during the work?
Many projects can be completed in phases, allowing the library to remain open.

Do you work with other contractors?
Yes. We frequently coordinate with flooring contractors and project teams.

What areas do you serve?
We work throughout the continental United States.

If you'd like, I can also help you create a very strong opening headline for the page that is still professional but grabs  

E-mail or Call

LibraryLifters (a division of NLI Inc.) 

121 seaboard lane 

suite 12

Franklin Tn 37064

(629) 239-9696

You can also contact us by using this form:

JOIN THE MAILING LIST

© 2035 by Site Name. Powered and secured by Wix

bottom of page